TRANSFER BOX
21.
22.
23.
Retain selected shim and differential front
bearing outer track with front output housing.
Up to serial no. 288709E: Retain gasket with
front output housing.
Carry out assembly of front output housing -
See Component assembling.
11.
12.
Position front output housing as shown.
Up to serial no. 288709E: Position a new
gasket, dry, on front output housing.
Position depth block, tool LRT-41-014/2 and
cross-bar, tool LRT-41-014/1 on front output
housing.
13.
14.
Position DTI LRT-99-006 on cross-bar
LRT-41-014/1 .
15.
16.
Zero DTI on depth block LRT-41-014/2.
Position DTI to cross-bar LRT-41-014/1, record
reading obtained.
17.
18.
Remove tools.
Up to serial no. 288709E: Remove and retain
gasket.
19.
Using the formula:
3.05
mm (0.120 in) + B - A = D where:
B = Height difference recorded between depth
block and cross bar
A = Average of readings to differential front
bearing outer track
D = Thickness of shim required to give
differential bearing pre-load of 0.05 mm (0.002
in)
20.
From resultant figure obtained, select
appropriate thickness shim from the range
available.
NOTE: Shims are available from 2.00 to
3.25
mm (0.08 to 0.13 in) thickness rising
in increments of 0.05 mm (0.002 in).
42
OVERHAUL
Categories | Land Rover, Land Rover Discovery |
---|---|
Tags | Land Rover |
Model Year | 1997 |
Download File |
|
Document Type | Workshop Manual |
Language | English |
Product Name | LT230T - Transfer Gearbox |
Product Brand | Land Rover |
Document File Type | |
Publisher | landrover.com |
Wikipedia's Page | http://en.wikipedia.org/wiki/Land_Rover |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)