ENGINE
12.
Using sequence shown, tighten bolts to:
Stage 1 - Initial torque
17. Position seal protector LRT-12-095 to
crankshaft.
18. Fit seal using tool LRT-12-091.
19. Fit Woodruff key to crankshaft.
20. Check crankshaft end-float.
Main bearing cap bolts - 13.5 Nm (10 lbf.ft)
Main bearing cap side bolts - 13.5 Nm (10
lbf.ft)
Stage 2 - Final torque
Main bearing cap bolts numbers 1 to 8 - 72 Nm
(53
Main bearing cap bolts numbers 9 and 10 - 92
Nm (68 lbf.ft)
Main bearing cap side bolts 11 to 20 - 45 Nm
(33
lbf.ft)
NOTE: If 0.508 mm (0.02 in) oversize main
bearings have been fitted, it may be
necessary to machine thrust faces of
crankshaft centre main bearing location to
achieve correct end-float. Ensure an equal
amount of material is removed from each thrust
face.
lbf.ft)
13.
14.
15.
16.
Trim off excess material from rear main
bearing cap side seals.
Clean seal location and running surface on
crankshaft.
Clean seal protector LRT-12-095 and lubricate
with engine oil.
21. Fit big-end bearings.
22. Fit timing cover and gears.
23. Fit flywheel or drive plate and ring gear
assembly.
Lubricate oil seal lip with engine oil.
24.
Fit sump.
46
OVERHAUL
Categories | Land Rover, Land Rover Defender, Range Rover |
---|---|
Tags | Land Rover |
Model Year | 1999 |
Download File |
|
Product Name | Range Rover 4.0 & 4.6 Litre, Defender V8i |
Product Brand | Land Rover |
Document File Type | |
Publisher | landrover.com |
Wikipedia's Page | http://en.wikipedia.org/wiki/Land_Rover |
Copyright | Attribution Non-commercial |
(0 votes, average: 0 out of 5)