1999-2002 Land Rover Defender Workshop Manual

ENGINE
Refit
9.
Clean mating faces of oil pump and stiffener
assembly to main bearing caps and cylinder
block.
10.
11.
Fit new ’O’ ring to oil pump housing.
Position oil pump and stiffener assembly on to
cylinder block ensuring 2 dowels are correctly
located.
6.
Using sequence shown, remove and discard 22
bolts securing oil pump and stiffener assembly.
12.
13.
14.
Fit new bolts and using sequence shown, tighten
to 13 Nm (10 lbf.ft) .
Lubricate a new ’O’ ring with engine oil and fit to
oil pick-up strainer.
Fit oil pick-up strainer, apply Loctite 242 to
threads of Torx screws; fit screws and tighten to
10
Nm (7 lbf.ft).
7.
8.
Remove oil pump and stiffener assembly.
NOTE: Dowel located.
Remove and discard ’O’ ring.
REPAIR
25
Product Specification
CategoriesLand Rover, Land Rover Defender
Tags
Model Year1999, 2000, 2001, 2002
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 627 pages
Document TypeWorkshop Manual
LanguageEnglish
Product NameDefender
Product BrandLand Rover
Document File TypePDF
Publisherlandrover.com
Wikipedia's Pagehttp://en.wikipedia.org/wiki/Land_Rover
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field