1999 Land Rover Discovery Series II Workshop Manual

PANEL REPAIRS
Repair
Valance upper assembly - LH
In this procedure, the front wing, the valance outer
reinforcement and the bonnet alarm switch mounting
bracket are replaced in conjunction with the LH
valance upper assembly.
Remove
1.
Disconnect both battery leads, negative lead
first.
2.
3.
Disconnect leads/multiplug from alternator.
Remove front wing.
EXTERIOR FITTINGS, REPAIRS,
+
Wing - front - up to 03MY.
+
Wing - front - from 03MY.
EXTERIOR FITTINGS, REPAIRS,
M77 1743
4.
Remove air filter assembly.
ENGINE MANAGEMENT SYSTEM -
+
V8, REPAIRS, Air cleaner assembly.
+
ENGINE MANAGEMENT SYSTEM -
Td5, REPAIRS, Air filter assembly.
Remove PAS/ACE reservoir.
Remove ABS modulator.
5.
6.
+
BRAKES, REPAIRS, Modulator unit
- ABS.
7.
8.
Remove brake pipes from valance.
Release harness from valance and position
aside.
M77 1690A
9.
Models with A/C: Depressurise A/C system
and remove pipes from valance.
AIR CONDITIONING, REFRIGERANT
RECOVERY, RECYCLING AND
RECHARGING, Refrigerant recovery,
recycling and recharging.
+
1.  Remove existing panel(s), prepare panel joint
faces and install new panel(s) in accordance
with Panel Replacement Procedure. Punch or
drill holes in new panel for plug welding as
shown.
77-2-28
REPAIRS
Product Specification
CategoriesLand Rover Defender, Land Rover Discovery II, Range Rover
Tags
Model Year1999
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 1529 pages
Document TypeWorkshop Manual
LanguageEnglish
Product NameDiscovery Series II
Product BrandLand Rover
Document File TypePDF
Publisherlandrover.com
Wikipedia's Pagehttp://en.wikipedia.org/wiki/Land_Rover
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field