1999 Land Rover Discovery Series II Workshop Manual

ENGINE - V8
Reassembly
1.
Clean timing chain and gears and gear  
locations.
Rocker shaft - overhaul
2.
Fit key to crankshaft.
$% 12.29.49  
If both rocker shafts are to be  removed, identify
each assembly to ensure  refitment to original
cylinder head.
Disassembly
3.
Temporarily fit gears to camshaft and  
crankshaft. If necessary, rotate shafts to  align
timing marks. When aligned correctly, the
timing  marks will face each other; crankshaft  
gear timing mark at twelve o'clock  position and
camshaft gear timing  mark at six o'clock
position.
1.
Release ht leads from rocker covers.
4.
5.
6.
7.
Remove gears from shafts and fit to  timing
chain.
With timing marks aligned, fit timing  chain and
gears as an assembly.
Restrain the camshaft gear and  tighten
retaining bolt to 50 Nm (37 lbf.ft).
Fit timing gear cover gasket.
+
ENGINE - V8, OVERHAUL, Gasket -
timing gear cover.
2.
Noting fitted position of 4 long screws or multi-
hex bolts, remove and discard 8 screws/bolts
securing rocker covers; remove rocker covers.
CAUTION: Screws/bolts must be replaced
with new 'patched' multi-hex bolts.
OVERHAUL   12-2-59
Product Specification
CategoriesLand Rover Defender, Land Rover Discovery II, Range Rover
Tags
Model Year1999
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 1529 pages
Document TypeWorkshop Manual
LanguageEnglish
Product NameDiscovery Series II
Product BrandLand Rover
Document File TypePDF
Publisherlandrover.com
Wikipedia's Pagehttp://en.wikipedia.org/wiki/Land_Rover
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field