1999 Land Rover Discovery Series II Workshop Manual

ENGINE MANAGEMENT SYSTEM - V8
4.
Disconnect multiplug from throttle body.
Throttle Body
$% 19.22.45
Remove
5.  Position a container below the throttle body to
collect coolant spillage.
6.
7.
8.
Loosen 2 clips securing coolant hoses to
throttle body and release hoses.
Remove 4 bolts securing throttle body to
plenum chamber.
1
Remove throttle body and discard gasket.
Refit
1.
M19 2576A
Clean plenum chamber and throttle body
mating faces.
1.
Loosen 3 clips securing air intake hose, release
air intake hose and position aside.
2.  Using a new gasket, position throttle body, fit
bolts and tighten to 9 Nm (7 lbf.ft).
Connect coolant hoses to throttle body and
secure clips.  
Connect breather hose to throttle body and
secure clip.  
Note: Pre 03 MY air intake hose illustrated.
3.
4.
5.
6.
Connect multiplug to throttle body.
Connect throttle and cruise control cables.
l
+
ENGINE MANAGEMENT SYSTEM
- V8, ADJUSTMENTS, Cable - cruise
control.
l
+
ENGINE MANAGEMENT SYSTEM
- V8, ADJUSTMENTS, Cable - throttle.
Position air intake hose and secure clips.
Top-up cooling system.
2.
Disconnect throttle and cruise control cables
from throttle body.
7.
8.
3.
Loosen clip securing breather hose and release
hose.
18-2-90
REPAIRS
Product Specification
CategoriesLand Rover Defender, Land Rover Discovery II, Range Rover
Tags
Model Year1999
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 1529 pages
Document TypeWorkshop Manual
LanguageEnglish
Product NameDiscovery Series II
Product BrandLand Rover
Document File TypePDF
Publisherlandrover.com
Wikipedia's Pagehttp://en.wikipedia.org/wiki/Land_Rover
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field