1999 Land Rover Discovery Series II Workshop Manual

AUTOMATIC GEARBOX - ZF4HP22 - 24
Refit
Solenoids - shift control valves
(MV 1 & 2)
1.  Clean MV2 shift control solenoid valve with lint
free cloth.
2.
3.
4.
5.
6.
7.
Position MV2 shift control solenoid valve to
valve body.
Position retaining fork, fit Torx screw and
tighten to 8 Nm (6 lbf.ft).
Connect multiplugs to both shift control  
solenoid valves.
Clean lock-up solenoid valve assembly with a
lint-free cloth.
$% 44.15.45
Remove
1.
Remove valve body assembly.
AUTOMATIC GEARBOX - ZF4HP22
+
- 24, REPAIRS, Valve body assembly.
Position lock-up valve assembly, fit and tighten
Torx screws to 8 Nm  (6 lbf.ft).
Fit valve body assembly.
+
AUTOMATIC GEARBOX - ZF4HP22
- 24, REPAIRS, Valve body assembly.
1
M44 1352
2.
Remove 3 Torx screws securing lock-up
solenoid valve assembly to valve body and
move solenoid aside.
NOTE: This is to gain access to remove Torx
screw and MV2 shift control valve.
M44 1353A
3.
4.
Note their fitted position and disconnect
multiplugs from shift control valves MV 1 and
MV 2.
Remove Torx screw and retaining fork securing
MV2 shift control solenoid valve to valve body.
Note that the tag on the retaining fork faces
towards the valve body.
5.
Remove shift control valve from valve body.
44-56
REPAIRS
Product Specification
CategoriesLand Rover Defender, Land Rover Discovery II, Range Rover
Tags
Model Year1999
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 1529 pages
Document TypeWorkshop Manual
LanguageEnglish
Product NameDiscovery Series II
Product BrandLand Rover
Document File TypePDF
Publisherlandrover.com
Wikipedia's Pagehttp://en.wikipedia.org/wiki/Land_Rover
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field